Control Tower vs Internal Logistics Management: The case of ABB Power Grids

DSpace/Manakin Repository

Show simple item record

dc.contributor.advisor Pesenti, Raffaele it_IT
dc.contributor.author Collura, Carolina <1994> it_IT
dc.date.accessioned 2020-07-10 it_IT
dc.date.accessioned 2020-09-24T12:01:57Z
dc.date.issued 2020-07-30 it_IT
dc.identifier.uri http://hdl.handle.net/10579/17553
dc.description.abstract The delocalization of some activities and departments outside a company not always turn to be a positive choice in terms of cost, knowledge and resources. The analysis conducted in this work demonstrates how, for ABB Power Grids (located in Monselice) the relocation of logistic department, in charge for heavy lift transformers transport, proved to be a wrong choice that leads again to an internally logistic management. After a heavy lift transport overview and a comparison between the activities and management offered by Control Tower and those offered by an internal transport management, a detailed analysis of transport cost has been conducted. The analysis started with an explanation of the case study context focusing on type of product offered, production volume over the 5 years taken into consideration (2015-2019) and transport cost evaluation. After pointed out the main components of a transport cost, the same has been subdivided in pure transport cost, transport extra costs and unpredictable extra costs. It was therefore possible to understand the percentage of transport quoted on budget and the percentage of transports affected by extra costs. Thanks to a deeper analysis it was feasible to study transport cost in relation to shipping area and transformer weight in order to understand in which extension they can affect final transport cost. it_IT
dc.language.iso en it_IT
dc.publisher Università Ca' Foscari Venezia it_IT
dc.rights © Carolina Collura, 2020 it_IT
dc.title Control Tower vs Internal Logistics Management: The case of ABB Power Grids it_IT
dc.title.alternative Control Tower vs Internal Logistics Management: The ABB Power Grids Case it_IT
dc.type Master's Degree Thesis it_IT
dc.degree.name Global development and entrepreneurship it_IT
dc.degree.level Laurea magistrale it_IT
dc.degree.grantor Dipartimento di Economia it_IT
dc.description.academicyear 2019/2020 - Sessione Estiva it_IT
dc.rights.accessrights closedAccess it_IT
dc.thesis.matricno 874128 it_IT
dc.subject.miur SECS-P/07 ECONOMIA AZIENDALE it_IT
dc.description.note it_IT
dc.degree.discipline it_IT
dc.contributor.co-advisor it_IT
dc.date.embargoend 10000-01-01
dc.provenance.upload Carolina Collura (874128@stud.unive.it), 2020-07-10 it_IT
dc.provenance.plagiarycheck Raffaele Pesenti (pesenti@unive.it), 2020-07-27 it_IT


Files in this item

This item appears in the following Collection(s)

Show simple item record